Premium material. Lower cost.

LOWER TOTAL COST

Reduce Cost Without Compromising Quality

TRADITIONAL CONSTRUCTION
  • Wood Frame
  • Stucco / Siding
  • Multiple Vendors
  • High Material Waste
  • Long Construction Time
  • High Fire Risk
BM DEPOT SYSTEM
  • Metal Cladding Structure
  • Supertile Cladding
  • One-Stop Project Delivery
  • Minimal Waste
  • Shortened Construction Period
  • Low Fire Risk (Class A)
UP TO 20% TOTAL COST SAVING

Total Cost Saving

How We Reduce Total Cost

Our integrated system reduces cost across materials, labor, time, and risk.

01

Labor Saving

  • Faster installation
  • Modular system
  • Reduced manpower
02

Material Saving

  • Supertile vs Stone/Marble
  • Factory-made Metal Stud
  • Reduced waste
03

Time Saving

  • Shortened construction period
  • Faster project completion
04

Insurance Saving

  • Lower fire risk
  • Reduced insurance premium
UP TO 20% TOTAL COST SAVING

Cost & Speed

Save 20% Construction Material Cost

Keep the Standard – Reduce the Material Cost

20%Cost Savings
  • Reduce labor through prefabrication
  • Optimized global sourcing & supply chain
  • Consolidated shipment savings
Proven ResultAdult Daycare Center, Anaheim, CA
Full One-Stop Supply
Cost and Schedule Improved

Build Faster. Save More. Stay in Control.

Complete One-Stop Building Material Delivery System

From Structure to Finish — Delivered as One System

Step 1 — Source

Global Sourcing

  • USA, Korea, China, India
  • Certified vendors
  • Cost-Optimized supply

Step 2 — Fabrication

Engineering & Prefabrication

  • Steel & LGS fabrication
  • Shop drawings
  • Prefabricated components

Step 3 — Delivery

Delivery & Installation

  • Schedule-based delivery
  • Consolidated shipment
  • Faster installation
Licensed Fabrication — City of Los Angeles
One System — Fast Delivery — Lower Cost

Project Case Study

Material Delivery of Prefabricated LGS System

Medical Office Building — Los Angeles, CA

  • 120,000 sf Remodeling
  • Interior + Structural Material Supply
  • LGS + Supertile

Adult Daycare Center — Anaheim, CA

  • 14,000 sf Remodeling
  • Full One-Stop Material Supply & Delivery
  • LGS + Supertile System

Key Results

  • Up to 20% Material Cost Savings
  • Accelerated construction schedule
  • Streamlined material procurement
  • Improved overall project efficiency

Real Projects. Real Results. Ready for Your Next Build.

Construction Process

Streamlined Construction from Frame to Finish

Step 1 — Frame

Structural Frame Installation

  • LGS frame installation
  • Structural alignment and layout
  • Ready for panel installation

Step 2 — Panel

Supertile Panel Installation

  • Direct fastening to frame
  • Tongue & groove system
  • Fast and precise installation

Step 3 — Finish

Joint & Finishing

  • Backer rod and sealant
  • Clean joint finishing
  • Complete exterior system
Faster Installation — Reduced Labor — Better Results

Product Range

One-Stop Supply for Complete Building Project

Step 1 — Global Sourcing

  • USA, Korea, China, India Sourcing
  • Certified manufacturing partner
  • Cost-optimized procurement

Step 2 — Engineering & Fabrication

  • LGS & structural fabrication
  • Shop drawings & coordination
  • Prefabricated components

Step 3 — Delivery & Installation Support

  • Container-based shipment
  • Scheduled delivery to site
  • Reduced site labor and faster installation
One System — Global Supply — Guaranteed On-Time Delivery

Complete Building Material Supply

From Structure to Finish — Everything in One System

🧱

Exterior

  • Supertile Cladding
  • Exterior Wall Systems
🏗

Structure

  • Structural Steel
  • LGS Framing System
🪟

Openings

  • Windows & Doors
  • Curtain Wall Systems
🚿

Interior

  • Bathroom Systems
  • Partitions & Finishes
🍽

Kitchen & Cabinet

  • Kitchen Cabinets
  • Custom Millwork
🔌

Electrical & Lighting

  • Lighting Fixtures
  • Electrical Components
One Source — Complete Building Supply — Simplified Construction

Start Your Project

Build Faster. Save More. Stay in Control.